Building Recertification, Milestone Inspections and SIRS

Structural inspections and reports for building recertification, Milestone inspections and structural integrity reserve studies across South Florida.

30 YEARS,THEN EVERY10 YEARSINSPECTELEVATION
Inspection points on a condominium elevation, for illustration only.

December 31, 2026 is the final SIRS date for associations whose Milestone inspection is due on or before that date.

Program requirements

RecertificationMiami-Dade County, formerly the 40-year inspection

Applies to: Most buildings. Single-family homes, duplexes and small buildings with an occupant load of 10 or less and 2,000 square feet or less are exempt.

Timing: At 30 years, then every 10 years. Condominium and co-op buildings of three or more stories within 3 miles of the coast and built in 1998 or later start at 25 years. Older buildings remain on their established schedule.

Building Safety Inspection ProgramBroward County

Applies to: Most buildings. Small residential buildings (up to four units and three stories or less), fee simple townhouses and structures under 3,500 square feet are among the exemptions.

Timing: At 25 years, then every 10 years.

Milestone inspectionStatewide, Florida Statute 553.899

Applies to: Condominium and co-op buildings with three or more habitable stories.

Timing: By December 31 of the year the building reaches 30 years of age, then every 10 years. A local building department may set this at 25 years based on local conditions, such as proximity to salt water.

Description: Phase 1 is a visual inspection by a licensed engineer or architect. Phase 2, which may include testing, is required if Phase 1 finds substantial structural deterioration.

SIRSStructural integrity reserve study

Applies to: Condominium and co-op associations with buildings of three or more habitable stories.

Timing: At least every 10 years. The first study was due by December 31, 2025, or by December 31, 2026 where the association's Milestone inspection is due by that date and the two are completed together.

Description: A study of how long the building's major components will last and how much the association must set aside to replace them.

Summary for general guidance. The current statutes, your local building department and any notice you have received determine what applies, and cities may have additional requirements, including in Palm Beach County. Sources: Florida Statutes 553.899 and 718.112, Miami-Dade County, Broward County Board of Rules and Appeals Policy 05-05.

Deliverables

  • Inspection of the building's structure
  • Report and required forms, signed and sealed by a Florida Professional Engineer
  • Reserve study for SIRS engagements
  • Restoration construction drawings where repairs are required

Recertification also includes an electrical inspection. We perform the structural portion and can advise on coordinating the electrical portion.

Fees

Building structural recertificationFrom $3,000
Building restoration drawingsFrom $3,000

Milestone inspection and SIRS fees are determined after the scope of work is discussed. View all fees